-
Maintenance Contracts
Oct 22 2013Some of the buildings we maintain include: Avida Bar, Featherston Bar and Leuven Belgian Beer Café (Wellington) – Contracted by Wellington businessman Russell Scott, Envirogroup was required to design and build air conditioning and kitchen ventilation systems as well as provide plumbing and gasfitting refurbishment for
Read More -
Aratere
Oct 11 2013In 2009 Envirogroup was engaged by Interislander, a division of Kiwi Rail Ltd., to provide a design brief and budget for the ventilation and air conditioning system to a new 30-meter middle section proposed for the Aratere rail ferry. When the hull extension project was approved in early 2010, Envirogroup was engaged to provide a detailed HVAC design with specifications and drawings as part of the Interislander’s shipyard tender process.
Read More -
Devon Park
Jan 01 2013In January 2010 Envirogroup completed a design-built installation of the largest residential apartment DHW solar system in NZ. Devon Park Apartments in Auckland consists of 57 apartment units within a 13-storey tower with adjoining 2-level townhouses. In 2007 Envirogroup designed and installed a replacement for the
Read More -
Transpacific
Oct 11 2013Since 2008 Envirogroup has been engaged as a technical solutions provider to Transpacific for several of their North Island sites, with roles that varied according to client’s requirements from design of tenders and installation to project management. Envirogroup’s initial concept was to burn the solvent using a specialist
Read More