• Maintenance Contracts

    Oct 22 2013

    Some of the buildings we maintain include: Avida Bar, Featherston Bar and Leuven Belgian Beer Café (Wellington) – Contracted by Wellington businessman Russell Scott, Envirogroup was required to design and build air conditioning and kitchen ventilation systems as well as provide plumbing and gasfitting refurbishment for

    Read More
  • Aratere

    Oct 11 2013

    In 2009 Envirogroup was engaged by Interislander, a division of Kiwi Rail Ltd., to provide a design brief and budget for the ventilation and air conditioning system to a new 30-meter middle section proposed for the Aratere rail ferry. When the hull extension project was approved in early 2010, Envirogroup was engaged to provide a detailed HVAC design with specifications and drawings as part of the Interislander’s shipyard tender process.

    Read More
  • Devon Park

    Jan 01 2013

    In January 2010 Envirogroup completed a design-built installation of the largest residential apartment DHW solar system in NZ. Devon Park Apartments in Auckland consists of 57 apartment units within a 13-storey tower with adjoining 2-level townhouses. In 2007 Envirogroup designed and installed a replacement for the

    Read More
  • Transpacific

    Oct 11 2013

    Since 2008 Envirogroup has been engaged as a technical solutions provider to Transpacific for several of their North Island sites, with roles that varied according to client’s requirements from design of tenders and installation to project management. Envirogroup’s initial concept was to burn the solvent using a specialist

    Read More